On Friday (3 Feb 2012) Jessie, Sara and I embarked on constructing timber floor for our anti-mice cage. Although we ran into some technical difficulties – surprisingly the floor happened to be slightly narrower than initial calculations – it was finally fixed onto the cage and transported back to the polytunnel.
The last task awaiting completion is fixing the wonky lid onto the cage without leaving any gaps for mice to sneak through.